null

EG4 GridBOSS MID V2 | 200A Service Entrance

Note: This is a new version. Please review the product page for details before purchase

$1,799.00

SKU:
1511048-V2.1
Spec Sheet:
Manual:

Version Update: The EG4 GridBOSS Micro-Grid Interconnection Device (MID) V2 now features a 90A breaker for use with the EG4 FlexBOSS 21.

EG4 GridBOSS Micro-Grid Interconnection Device (MID) V2 

Simplify and Optimize Your ESS

The EG4 GridBOSS MID simplifies your Energy Storage System (ESS) by consolidating up to 10 components into a single, powerful unit. Designed to seamlessly connect utilities, generators, inverters, and loads, it offers centralized control, easy installation, and real-time remote monitoring.

Key Features:

  • One-Point ESS Control: Connect and manage utility, inverters, generator, and loads from a single device.
  • Reduced Complexity: Replace breakers, transfer switches, and more with one compact solution.
  • Smart Load & Power Shedding: Automate power management to optimize battery performance.
  • 200A Service Entrance: Reliable with a 22 kAIC main breaker for powerful service integration.
  • Real-Time Monitoring: Access and adjust settings remotely via the EG4 app or monitoring system website.
  • Configurable Breakers: Supports one generator up to 125A, 3 hybrid inverters up to 90A each, and 4 smart ports ranging from 60A to 125A.

Specifications:

  • Voltage: 120/240VAC
  • Max Current: 200A
  • Hybrid Ports: 3 (up to 90A each)
  • Smart Ports: 4 (up to 125A)
  • Operating Temp: -40°F to 140°F
  • Warranty: 10 years
  • Certifications: UL Certified, compatible with Eaton 200A main breaker model CSR25K

Elevate Your ESS Today: Explore how the EG4 GridBOSS can streamline and enhance your energy management.

 

Important EG4 GridBoss Breaker Information

Each EG4 GridBoss unit includes:

  • 90A Breaker:
    Compatible only with the EG4 FlexBOSS21

  • Smart Port Breakers:
    Rated at 30A, 40A, 60A, and 80A.

Please Note:

  • You must purchase a 70A breaker (due to ship separately in early December) for use with the EG4 18kPV Hybrid Inverter.
  • You must purchase a 50A Breaker separately for use with the EG4 12kPV Hybrid Inverter.
  • 125A Breaker (sold separately) can be used with either the Smart Port or Gen Port.
  • 200A main breaker not included (must be purchased separately; model required: Eaton 200A CSR25K, not available through Signature Solar. See manual for more information).

Notice:

In order for the GridBOSS to meet it's UL Certifications copper wire must be used inside the unit. 

Spec Sheet:
Manual:
10-YEAR WARRANTY